Location: The Netherlands
Industry: Sand and Gravel
Capacity: 350 t/h, fraction 0 – 80 mm
Scope: Turnkey ship unloading installation for sand and gravel. Including bunker 9 m², four (4) belt conveyors (189 meter in total, on 13 meter height) and electrical installation.